Before work begins, MaxWee identifies the local rules, industry standards, and technical controls that apply to the project. The delivery plan records who owns each decision, what evidence will be available for review, and when to escalate a change or incident.
GDPR · ISO/IEC 27001 · HIPAA · ISO 31030 · ICOM
Risk & controls
Compliance across five industries
Each area sets out the rules to review, the controls to plan, and the parties responsible for decisions.
Cross-border trade and brand protection
Document who imports each shipment, how landed cost is calculated, and whose authorization covers each sales channel. Reconcile orders, customs and tax records before settling with distributors or fulfillment partners.
VAT / IOSS
Incoterms® 2020
HS classification
MAP
Review EU VAT and IOSS eligibility, UK VAT, and the applicable North American tariff schedule with the project’s tax and customs advisers.
Record the HS classification rationale, importer responsibility, and the named destination when using a DDP term. Confirm the seller can meet destination import obligations.
Maintain a list of authorized channels and product claims. Review any minimum advertised price policy and distributor restrictions under local competition law before use.
Software security and data privacy
Draw the boundary between each application, operator, and service provider before selecting a deployment. Use ISO/IEC 27001 requirements and relevant SOC 2 criteria to map controls and evidence. Define the data protection duties separately for each jurisdiction.
GDPR
CCPA/CPRA
ISO/IEC 27001
SOC 2 Type II
Plan TLS 1.3 for supported endpoints and AES-256 for applicable storage. Set key ownership, access review, audit logging, and restore-test obligations in the deployment scope.
Assess US, EU, Singapore, and Japan deployment options against storage, backup, support access, and cross-border transfer requirements before committing to a region.
For contracted private AI projects, set provider terms and technical controls so customer content is excluded from public model training. Verify the retention settings for each integration.
Travel risk and duty of care
Use ISO 31030 guidance to build a travel risk program around the destination, travelers, suppliers, and specific activity. Identify who can approve a change and who is on duty when travelers are in transit.
ISO 31030
Duty of Care
Brief travelers on destination risks, accessibility, local emergency numbers, insurance, and what to do when their itinerary changes.
Agree on supplier alternates, escalation thresholds, and a 24-hour multilingual contact for contracted programs that require continuous coverage.
Limit access to traveler lists and booking details. Record decisions and handovers in an incident log available to the responsible operations team.
Museum stewardship and cultural rights
Review provenance, loan conditions, conservation, access, and publication permissions with the collection custodian. ICOM ethics and collection-specific requirements inform the project from installation through deinstallation.
ICOM Code of Ethics
≤50 lux where specified
ATA Carnet
IIIF
Follow lender-approved limits for relative humidity, temperature, and cumulative light exposure. Use a limit of 50 lux or below for sensitive objects when specified by the conservator.
Prepare condition reports and signed handover records, confirm fine art insurance and customs routing, and use an ATA Carnet where eligible for temporary admission.
Record the owner, approved use, credits, and release scope for every asset. Include applicable rights statements in IIIF presentation metadata and agree on permissions for ISBN-listed publications.
International medical coordination
Keep intake, translation, records exchange, and patient logistics separate from clinical decisions. Check the destination provider’s relevant accreditation and international patient intake process before sending a referral.
HIPAA
GDPR
JCI
JMIP
Collect only the clinical material the receiving provider needs. Confirm authority to transfer it, then use agreed encrypted channels with time-limited access and an activity record.
Identify HIPAA-covered entities and business associates where applicable, and put required business associate agreements and role-specific safeguards in place before handling protected records.
Keep source documents alongside reviewed translations. Confirm the identity of the receiving team and document any missing exams, consent questions, or transfer limits.
Project review
Evidence you can review during procurement and delivery
Ask the relevant division to confirm the scope, date, and owner of any evidence you need for due diligence. Documentation is shared through an agreed channel and, where necessary, under confidentiality terms.